General characteristic of the LLC DTEK Zuevskaya TPP and its main function. The history of appearance and development of the company. Characteristics of the organizational management structure. Analysis of financial and economic performance indicators.


Аннотация к работе
General characteristic of the LLC DTEK Zuevskaya TPP and its main functions The history of appearance and development of LLC DTEK Zuevskaya TPPList of referencesEnergy is one of the main factors of production and the formation of modern society in general. Electric power is the leading element of country"s energy. Regarded as the industrial-technological complex, it includes systems for power generation joint (combined) production of electricity and heat as well as electricity transmission to the subscriber installations consumers.

In accordance with the curriculum I did my practice work in a limited liability company DTEK Zuevskaya TPP from 10th of February 2014 to 23rd of February 2014. This company is a limited liability and it is has the private form of ownership.

LLC "DTEK Vostokenergo" is the first and only one private power company in Ukraine which occupies fourth part of the electricity market produced by thermal power plants of Ukraine. LLC "DTEK Vostokenergo" includes three thermal power plants (TPP): Zuevskaya, Kurahovskaya (both located in the Donetsk region) and Lugansk (Lugansk region). The installed capacity of enterprises of "DTEK Vostokenergo" is 4157 MW. Due to the successful reconstruction of the equipment the installed capacity of the plant increased in 2009 to 32 MW and in 2010 to 40 MW. All TPP "DTEK Vostokenergo" operate mainly on thermal coal produced and enriched by DTEK.

ZUTES (DTEK) is the youngest of Ukrainian stations and one of the most efficient in the industry. The station ranked third among fourteen Ukrainian TPPS for production and supply of electricity on the domestic energy market. For all the time the plant produced 156.7 billion KWH of electricity. Installed capacity of TPP is 1245 MW. Currently three power units are operated, one more is modernized. Among the secrets of success experts called effective leadership and management (ZUTES included in the company and is a part of DTEK "Vostokenergo"), professional staff, and as well as a large-scale modernization of facilities in accordance with the highest European standards. All this makes the station a modern and cost-effective, and hence demanded.

The purpose of the practice is to acquire practical skills in the collection and processing of primary information in the performance of analytical calculations and the development of measures for improvement of the economic and financial situation of the company.

To achieve this goal the following objectives have been identified: - analyzed peculiarities of organizational and management structure of the organization;

- analyzed the economic aspects of production;

- learn the principles of business taxation.

During the practical training, it was: - learned the basic documents which ensure correct functioning of the organization (work plan accounts, accounting policies and documents);

- acquainted with the work of the main areas of accounting (the movement of goods, cash, receivables, payments to staff, etc.);

- participated in a business enterprise;

Based on the reports for the three years it was conducted research of the basic indicators of financial and economic activities of the company, studied fixed assets and working capital, the cost of production and manufacturing. financial economic indicator company

1. General characteristic of the LLC DTEK Zuevskaya TPP and its main functions

1.1 The history of appearance and development of LLC DTEK Zuevskaya TPP

Zuyevskaya thermal power station (ZUTES; previously ZUGRES - 2) is a thermal power plant, located 40 kilometers east of Donetsk (Donetsk region, Ukraine). It is included to a private power generating company "DTEK Vostokenergo". The plant is a dominant local employer for the village of engineers, located 1 km south to the plant.

Back in 1921, when the famous electrification plan was approved, a small settlement in the Donbass was destined to a great future. In 1932 it was put into operation Zuevskaya State District Power Plant. By 1977 ZUGRES - 1, previously one of the most powerful power stations of the Soviet Union has already developed its industrial life and became an experimental research laboratory of All-union thermotechnical Institute named by F. E. Dzerzhinsky. In its replacement it was beginning erection of ZUGRES - 2, one power generating unit of which was more powerful than all ZUGRES - 1 [3].

The starting point in the history of ZUGRES-2 can be considered as May 15, 1974, when the decree of Ministry of Energy of the USSR was approved future power capacity equal to 2400 MW. For the construction of ZUGRES-2 were withdrawn unsuitable for agriculture steppe lands.

The first director of power plant was V.I. Yakovlev. He was replaced by P. Sheremet, who headed Mironovskaya TPP until 1976.

The project Zuyevskaya power which has capacity 2 400MW on 8 power generating units by 300 MW e

Вывод
List of references